Research: Water Supply Planning and DesignLocation: Ibb, YemenClient: World BankAddress: Alexander E. Bakalian World Bank 1818 H Street Washington DC 20433, USA | Start Date: 2009Completion Date: 2010Duration of Assignment: 1yearApprox. Value: $55,000Total No. of staff-months: 60 Associated Consultants (AC): ECA, UK No. of staff-months by AC: 8 Involved Seniors: |
Project’s BriefAl Salabah is located in the Al Dhohra District of Ibb city, about 1.4 km southwest of Ibb city center. It is on flat ground, Ibb Local Water and Sanitation Corporation constructed a water supply network in the Al Dhohra Al Soflah area in 2004 with a total network length of 5,000 meters using ducktail iron pipes (with 1”, 2” and 3” diameters). The water network covers around 20% of the existing area and about 300 households. Those not connected to the LC network either rely on water from a private network or from water tankers. Those connected to the private network are charged YR 200 per m3 based on estimated consumption (typically 10 m3)Scope of ServiceThe objectives of the Yemen urban water OBA project are:
Key indicators: The main development objective of increased access will be measured by the number of new individual household connections added to the system via the subsidy scheme. |