Research: Project Requirements and Site AnalysisLocation: Al-Nadirah TownClient: Ministry of Water & Environmental Urban Water Supply and Sanitation Project Address: Sana’a, Yemen | Start Date: June 2009Completion Date: 2010Duration of Assignment: 1 year Approx. Value: $220,000 Total No. of staff-months: 24 Associated Consultants (AC): Consolidated consultants (CC), Amman, Jordan No. of staff-months by AC: 8 Involved Seniors: |
Project’s BriefRahida is located some 35 KMS east of the city Taiz, see fig (3.7). The project area lies between longitude 41° 76′ 22′′ E and 44 ° 18’10.36” E and between latitudes 13 ° 22′ 67. 41″ N and 13 ° 22′ 38.51″N. The ground elevation ranges from1117.5m to 1,020m a.m.s.l. Scope of Service Carried out the following works for on-site and off-site works.Preliminary inception, collection of data for preparation of inception report, feasibility study. Preliminary design, calculations, drawings and report, detailed designs calculations. Drawings and contract document for draft final report and final report. |