Khor Al Mukalla Water supply & Sewerage Project.

Location :. Mukalla ,Yemen                       Client : AL-Amodi Investment Group.

Start Date : 2002

Completion Date:  2003

Address :

Mukalla, Hadramout

Tel:++967-5-303399

Fax:++967-5-307438

Total No. of staff-months: 48

Name of Associated consultants: : N/A

Narrative description

Al Mukalla Municipal Council requires 500,000 m2 additional water supplies for the extended limits. The work includes preparing project report for the same includes to make survey of existing old underground sewage system and to prepare plans and estimates for the work of its re-commissioning. Project, Preparing project report of water supply and sewerage system in the extended Municipal limits detailed survey, planning and design; preparation of preliminary engineering drawings, cost estimates etc. Completed project will cover approximately a 12 Km network length for sewerage system & 20 Km network length for water supply system. Work also included preparation of an Environmental Impact Assessment to ensure that project options under consideration are environmentally sound and sustainable.