Research: Environmental Impact AssessmentLocation: Ibb Client: The Ministry of Public Works and Highways Address: Sana’a Office – ROY | Start Date: March 2007Completion Date: On Going Duration of Assignment: On Going Involved seniors: Urban Planner: Hani Al-Sahooly |
Project’s BriefLocal asphalt urban road in the Ibb Gov. Total length of the road is 28 Km. Duties included but not limited to the complete study and design services including conceptual, preliminary to final design, specification, and B.O.Q., Complete design and supervision survey services &Complete construction supervision services.
Scope of Service The services were competed for under (local and international) conceptual competition. Tasks performed include conceptual, preliminary, detailed architectural design, preparation of tender documents, and services for infrastructure and buildings including landscaping. As well as the preparation of roads utilization plan for urban traffic, roads network , parking, general concept for construction, authorization planning & preparation of the executive planning and expansion of sewage treatment plant, water supply, storage storm water drainage, electrical and communications networks and a feasibility study for assessing economic and financial. |