{"id":374068,"date":"2025-03-03T12:46:52","date_gmt":"2025-03-03T12:46:52","guid":{"rendered":"https:\/\/hs-gp.com\/sector\/sulimani-residential-iraq\/"},"modified":"2025-04-14T10:33:38","modified_gmt":"2025-04-14T10:33:38","slug":"sulimani-residential-iraq","status":"publish","type":"sector","link":"https:\/\/hs-gp.com\/ar\/sector\/sulimani-residential-iraq\/","title":{"rendered":"Sulimani Residential, Iraq"},"content":{"rendered":"<h2><strong>Narrative Description of Project:<\/strong><\/h2>\n<ul>\n<li>Preparing Master Plan, detailed plan, and design of the infrastructure for a business and logistic district as well as residential area, through Structure Plan concept development including mapping and identification of key infrastructure components. The project includes multi-specialty business and logistic zones and a residential area and it includes replanning of the upgrading sites (informal settlements).<\/li>\n<li>infrastructure development strategy, pre-design studies followed by Master Plan and infrastructure design based on state-of-the-art technology and high standards and planning regulations on approximately 4700 hectares.<\/li>\n<li>Assessment of the risks and implementation of a structured plan including legal, political, and financial risks)<\/li>\n<li>The project is integrated into the general master plan of Sulimani City for future developments and expansion plans.<\/li>\n<li>Training and Capacity building for the Client\u2019s officials after evaluation of their capabilities including Workshops and Training Program.<\/li>\n<\/ul>\n<h2><strong>Description of Actual Services Provided by Your Staff:<\/strong><\/h2>\n<h3><strong>Preparation of the master plan of Sulimani City. The Tasks included but were not limited to the following:<\/strong><\/h3>\n<ul>\n<li>Physical mapping: Comprehensive Survey and GIS Mapping for the project area and<\/li>\n<li>Conduct training for the Client\u2019s Officials on the operation of the Monitoring and Control Systems (Capacity building).<\/li>\n<li>Physical Spatial planning includes land use, urban, regional, transport, and environmental planning<\/li>\n<li>Prepare detailed plans for a residential and business district, incorporating a multiplicity of activities and uses. The works included but were not limited to preparing details plans for the CBD central business districts<\/li>\n<li>Prepare development layout and engineering designs for the water supply, storage, and firefighting water networks, in addition to sanitation systems and networks of 5000 HA and app 50,000 households.<\/li>\n<li>Assist the client and the BOT investor in selecting the best locations of the wastewater treatment plants on the project&#8217;s site.<\/li>\n<li>Conducting socio-economic and environmental assessments.<\/li>\n<li>Prepare development layout and engineering designs for the storm drainage system<\/li>\n<\/ul>\n<h2><strong>The project will undergo two interconnected phases as follows:<\/strong><\/h2>\n<ul>\n<li>Phase one: Pre-design study: Preparing a complete pre-design study for the proposed project covering all aspects of architectural, engineering, project management, and operational planning issues.<\/li>\n<li>Phase two: Based on the pre-design study, a comprehensive physical master plan will be prepared for the project.<\/li>\n<\/ul>\n","protected":false},"author":2,"featured_media":372849,"parent":0,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"sector-category":[371,370],"class_list":["post-374068","sector","type-sector","status-publish","has-post-thumbnail","hentry","sector-category-371","sector-category-370"],"acf":[],"_links":{"self":[{"href":"https:\/\/hs-gp.com\/ar\/wp-json\/wp\/v2\/sector\/374068","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hs-gp.com\/ar\/wp-json\/wp\/v2\/sector"}],"about":[{"href":"https:\/\/hs-gp.com\/ar\/wp-json\/wp\/v2\/types\/sector"}],"author":[{"embeddable":true,"href":"https:\/\/hs-gp.com\/ar\/wp-json\/wp\/v2\/users\/2"}],"version-history":[{"count":1,"href":"https:\/\/hs-gp.com\/ar\/wp-json\/wp\/v2\/sector\/374068\/revisions"}],"predecessor-version":[{"id":374069,"href":"https:\/\/hs-gp.com\/ar\/wp-json\/wp\/v2\/sector\/374068\/revisions\/374069"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hs-gp.com\/ar\/wp-json\/wp\/v2\/media\/372849"}],"wp:attachment":[{"href":"https:\/\/hs-gp.com\/ar\/wp-json\/wp\/v2\/media?parent=374068"}],"wp:term":[{"taxonomy":"sector-category","embeddable":true,"href":"https:\/\/hs-gp.com\/ar\/wp-json\/wp\/v2\/sector-category?post=374068"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}