Preparing Master Plan, detailed plan, and design of the infrastructure for a business and logistic district as well as residential area, through Structure Plan concept development including mapping and identification of key infrastructure components. The project includes multi-specialty business and logistic zones and a residential area and it includes replanning of the upgrading sites (informal settlements).
infrastructure development strategy, pre-design studies followed by Master Plan and infrastructure design based on state-of-the-art technology and high standards and planning regulations on approximately 4700 hectares.
Assessment of the risks and implementation of a structured plan including legal, political, and financial risks)
The project is integrated into the general master plan of Sulimani City for future developments and expansion plans.
Training and Capacity building for the Client’s officials after evaluation of their capabilities including Workshops and Training Program.
Description of Actual Services Provided by Your Staff:
Preparation of the master plan of Sulimani City. The Tasks included but were not limited to the following:
Physical mapping: Comprehensive Survey and GIS Mapping for the project area and
Conduct training for the Client’s Officials on the operation of the Monitoring and Control Systems (Capacity building).
Physical Spatial planning includes land use, urban, regional, transport, and environmental planning
Prepare detailed plans for a residential and business district, incorporating a multiplicity of activities and uses. The works included but were not limited to preparing details plans for the CBD central business districts
Prepare development layout and engineering designs for the water supply, storage, and firefighting water networks, in addition to sanitation systems and networks of 5000 HA and app 50,000 households.
Assist the client and the BOT investor in selecting the best locations of the wastewater treatment plants on the project’s site.
Conducting socio-economic and environmental assessments.
Prepare development layout and engineering designs for the storm drainage system
The project will undergo two interconnected phases as follows:
Phase one: Pre-design study: Preparing a complete pre-design study for the proposed project covering all aspects of architectural, engineering, project management, and operational planning issues.
Phase two: Based on the pre-design study, a comprehensive physical master plan will be prepared for the project.